Commercial EV Charging Point Installation – Birmingham
Scope of Work
- To upsize existing GRP unit to facilitate new OPEN board & extend base
- To install 1x new 200A submain to EV charger bays @ far side of the car park, cable to be run at high level on purlins and existing tray
- Cable to be run in existing duct under the roadway with a new wall mounted IP enclosure being installed in the corner of the 1st bay behind the Armco barrier.
- 1x 12way OPEN board to be installed to supply 9x chargers
- 1x 8way OPEN board to be installed in existing GRP to feed 6x chargers
- 1x 200A switch fuse to be installed in existing GRP unit
- Existing tray to be upsized to allow for new cabling
- Ground works to be approx. 10m soft trenching & lift block paving
- 2x concrete bases to be installed for 3x chargers & 3x chargers to be mounted on the corner of the building